New Bath Remodel

We started this bathroom on Wednesday, tore everything out. Everything went, aside from a couple of walls and the doors into and out of the bathroom. The walls of the shower were covered with Kerdi water proofing and the floor was covered with Ditra as well. Friday we installed tile on the shower pan and the floor. The shower door will be an Alumax door, a pedestal sink, new toilet medicine cabinet and a new fan. A few more days and it will be wrapped up.

20120325-120526.jpg
20120325-120536.jpg
20120325-120544.jpg