Kitchen Wrap

We finished our kitchen job this week. The project consisted of tearing out all the cabinets, tops and a large portion of a non-load bearing wall. New cabinets were installed along with new can lighting, a microwave circuit, and granite tops. Nothing was really done to the floor other than adding a few tiles to set the cabinets on.

20120322-184250.jpg
20120322-184259.jpg
20120322-184305.jpg
20120322-184313.jpg
20120322-184322.jpg
20120322-184336.jpg